Village of Ilion East Street Neighborhood Sewer Improvements – Phase I

    ilion
    PROJECT DESCRIPTION
    CCI Companies, Inc. (CCI) was retained for the Village of Ilion East Street Neighborhood Sewer Improvements – Phase I project located in the Village of Ilion, New York. The work included separating stormwater sewer from sanitary sewer piping, installing new curbing and sidewalks, and re-surfacing of village streets.

    In support of project close out, CCI required a pre-acceptance CCTV inspection of the newly installed sanitary sewer conveyance piping.

    Project specifications required a CCTV inspection of the following polyvinyl chloride sanitary sewer conveyance piping:

    • 350 feet of 8-inch;
    • 665 feet of 15-inch; and
    • 635 feet of 21-inch.

    SUI utilized an Envirosight RovverX crawler camera system to capture colored video of the conveyance piping and WinCan (Version 8.0) video pipeline inspection software to note pipe defects and observations.

    Deliverables included the CCTV Inspection report, video files, and digital photographs.

    • Service Area: CCTV Inspection