Ulster Correctional Facility

    PROJECT DESCRIPTION
    In 2013, our client was retained by the Office of General Services (OGS) to provide engineering design services for the hot and cold water replacement project located at the Ulster Correctional facility in the Town of Wawarsing, New York.

    The project consisted of installing approximately 6,200 feet of above ground hot and cold water lines. In support of project design, Sage required an ASCE Quality Level B subsurface utility investigation to identify the location of existing subsurface utilities. The utility investigation was limited to a swath, 100 feet in width, centered on the proposed hot and cold water alignment.

    Deliverables included an Auto.CAD.DWG file of the designated subsurface utility alignments.

    • Project Cost: $42,000
    • Service Area: Subsurface Utility Investigation