    PROJECT DESCRIPTION
    Marcellus Construction Company, Inc. (Marcellus) was retained for the CSO Control Project A8.1 – Phase I project located in the City of Utica, New York. The work included separating stormwater sewer from sanitary sewer piping, installing new curbing and sidewalks, and re-surfacing of city streets.

    In support of project close out, Marcellus required a pre-acceptance CCTV inspection of the newly installed stormwater and sanitary sewer conveyance piping.

    Project specifications required a CCTV inspection of the following stormwater and sanitary sewer conveyance piping:

    • 455 feet of 8-inch;
    • 3,000 feet of 12-inch;
    • 2,500 feet of 15-inch;
    • 450 feet of 18-inch;
    • 621 feet of 24-inch; and
    • 1,167 feet of 36-inch.

    SUI utilized an Envirosight RovverX crawler camera system to capture colored video of the conveyance piping and WinCan VX video pipeline inspection software to note pipe defects and observations.

    Deliverables included the CCTV Inspection report, video files, and digital photographs.

    • Service Area: CCTV Inspection